Korea Testing & Research Institute
MiSung Kim, General Manager
This session will introduce the key evaluation criteria and procedures for IEC-based Site Acceptance Testing (SAT), which verifies the safety and performance of ESS installations before operation. It will cover system integration among batteries, power conversion systems, and protection and control equipment, as well as insulation, grounding, emergency shutdown, fire detection, and response functions. The presentation will also discuss systematic approaches to defining, tracking, and verifying TRPP requirements throughout the project lifecycle, providing practical guidance for improving test reliability and operational safety.



